Surface coal mine permit application for successful reclamation, semi-arid shortgrass prairie (Wyoming, USA)
Anna Krzyszowska Waitkus
摘要:Approximately 40% of USA coal originates in an ecologically sensitive area of semi-arid shortgrass prairie in Wyoming.Before a surface coal mine can begin operation in the USA,it must secure a mining permit and comply with regulations and performance standards under the USA Surface Mining Control and Reclamation Act (SMCRA),other federal environmental acts,and state programs.The Wyoming Department of Environmental Quality (WDEQ)/Land Quality Division (LQD) administers Wyoming's coal regulatory program.The permit application and bonding process for the largest surface coal mine permit in the USA,North Antelope Rochelle Mine (NARM) located in short grassland prairie in the northeast Wyoming,is discussed.The permit application process begins with the collection of baseline environmental data that characterizes premining conditions of the permit area.The permit application includes adjudication information,baseline information,mine and operation plans,and reclamation plans.Fulfillment of permit commitments and requirements of rules and regulations are inspected monthly by the LQD's representative in the field.Before a mine permit is issued,the mine operator must submit a reclamation bond to secure the performance of reclamation obligations that is later revised annually.In Wyoming,four reclamation bond release phases indicate the completion of various stages of the reclamatikon process.NARM's specific bond release verification cirteria,performance standards,and field verificatoins of bond release phases are discussed.The Bond Release Geodatabase (a GIS/GPS approach) was developed for this mine to monitor progress in meeting criteria and performance standards for incremental bond release.The Bond Release Geodatabase significantly reduces the time needed to track bond release progress,reach agreement between operator and regulator,and improve the state inspector's ability to assess reclamation adequacy and progress.
机标关键词:
论文发表日期:2018-01-01
在线出版日期:2025-08-15(本平台首次上网日期,不代表文献的发表时间)
页数:10( 8-17 )
英文信息展开
国际煤炭科学技术学报(英文版)

国际煤炭科学技术学报(英文版)

CSTPCD
ISSN:2095-8293
年,卷(期):2018,5(1)
所属栏目:RESEARCH ARTICLES