1Research on stability influence of slope and ground surface by open-pit and underground miningYANG Zhan-junMining Engineering1-32Application of high precision fuse blasting cap and hole by hole blasting technique in Heidaigou mineZHANG YongMining Engineering4-53Study on topsoil stripping through semi--continuous technology in Buzhaoba surface mineDUAN Song-liang, CHE Zhao-xueMining Engineering6-74Study on the rules of the deformation failure of high steep toppling-creeping slippage slopeLI Shao-chenMining Engineering8-105Development and transportation system optimization of Anjialing surface mineLIU Ru-cheng, LIU Feng, XU ChangMining Engineering11-136Probing into eastern working slope south part landslide mechanism in Shengli open-pit mineSUN Xin-hu, SHU Ji-sen, GUO Bing-bing, ZHANG Jun-yangMining Engineering14-167Security research on transportation coal roadway of Antaibao surface mineWANG Zhen-weiMining Engineering17-198Causes and countermeasures of adverse blasting phenomenon in surface mineXU Quan-yaoMining Engineering20-219Control mining technology of inclined special thick coal seams high slope in Fushun western surface mineXIAO PingMining Engineering24-26,2910Numerical analysis of small-size anti-slide pile controlling the inclined-slope failureZHANG Wen-hua, SU Hua-youMining Engineering27-2911Application of medium-length hole blasting into a certain cutting excavationMining Engineering30-31,3412Numerical experimental analysis of bedding slope stability based on RFPA-CentrifugeWANG Dong, CAO Lan-zhu, SONG Zi-lingMining Engineering32-3413Development transportation system transformation in Anjialing surface mineLIU Zhen-wu, CUI Wen-binMining Engineering35,5514Application of many rows hole millisecond blasting in Huolinhe southern surface mineMining Engineering36-37,5515Causes and effect of bubble formation in water phase melting of emulsion explosiveBAO Chuan-qi, FANG Zhi-meiMining Engineering38-39,4216Application of AACM flexible start-up system in long-distance belt conveyorLIU ChiElectromechanical and Automation40-4217Welding technology of 395 excavator bucket forearm replacementDONG XinElectromechanical and Automation43-4418Design and realization of regional 3D digital dynamic management information systemHAN Yong, QIU Fei-ting, MAO Cong-congElectromechanical and Automation45-46,5219Realization of remote-viewing technology in maintenance centerLI Xiu-dongElectromechanical and Automation47-48,5820Humble opinions of Shenfu south region electromechanical equipment maintenance centerWANG Xiao-wei, DONG Wan-jiang, LIN ZhenElectromechanical and Automation49-50,76